Hi All,

I'm using Solidworks workgroup PDM and I need to backup my Projects periodically on Dropbox for a specific client. For this purpose I was wondering if there is any way to schedule the pack and go command for specific Project in the vault.

Thanks
Ashish

1 answer

  • Lukasz Siwiec
    Lukasz Siwiec over 2 years ago

    Hi,
    Copy Tree offers the same functionality as SolidWorks Pack & Go, but it contains tools that are built specifically for use with SolidWorks Enterprise PDM.

    Copy Tree is available from the Tools pull-down of the local vault view.
    As with Pack & Go, the files can be copied to a different folder , including a folder outside of the local vault view. The files can also be saved to a zip file.